Ref WP |
Activities |
Plan \ milestones |
1.1.1 |
Curricula Analysis related to BIOART studies in PSTU |
15-01-2018 |
1.1.2 |
Regional summary analysis of existing curricula in engineering courses with emphasis on artificial implants and bio-signals |
15-01-2018 |
4.1.1 |
Develop University-Enterprise collaborative group |
01.02.2018 |
1.2.1 |
Survey on competences in Artificial Implants required at labor market |
15-02-2018 |
1.2.2 |
Meetings with industrial partners |
15-02-2018 |
1.2.3 |
Summary SWAT Analysis for the region |
15-02-2018 |
5.1.1 |
Define Hierarchical Project Management Structure |
15-02-2018 |
5.3.1 |
Kick-off meeting (at Polytechnic of Madrid) |
15-02-2018 |
4.1.2 |
Develop collaboration plan |
01.03.2018 |
4.2.1 |
Develop Project web-site |
01.03.2018 |
1.3.1 |
Setting strategic plan for cross regional knowledge triangle network |
15-04-2018 |
3.1.1. |
Setting Quality Assurance Group and preparing Quality Assurance Plan |
15-04-2018 |
2.3.1. |
Training for Bio-Medical System Design at the University of Thomas More Mechelen – Antwerpen vzw (Belgium) |
01-06-2018 |
2.4.1. |
Local teacher training |
01-09-2018 |